城市雨洪模拟与年径流总量控制目标评估——以北京市未来科技城为例
庞璇, 张永勇, 潘兴瑶, 杨默远

Urban stormwater simulation and assessment of the control rate of total annual runoff: A case of the Future Science and Technology Park in Beijing
Xuan PANG, Yongyong ZHANG, Xingyao PAN, Moyuan YANG
表1 北京市未来科技城北区断面场次降雨对应径流过程
Table 1 Runoff process corresponding to precipitation in the north section of the Future Science and Technology Park in Beijing
降雨开始时间 终止时间 摘录起始时间 摘录截止时间 降雨排泄时间 径流量/m³
2016/6/9 20:45 2016/6/9 22:35 2016/6/9 21:00 2016/6/10 6:00 7h25min 6 739
2016/7/14 19:10 2016/7/15 5:45 2016/7/14 19:00 2016/7/15 12:00 6h15min 10 886
2016/7/20 1:25 2016/7/21 6:20 2016/7/20 4:00 2016/7/21 23:00 16h40min 123 898