燃煤电厂环境污染第三方治理研究
黄华, 丁慧平

Environmental pollution control by a third party in coal-fired power plants
Hua HUANG, HuiPing DING
表6 仅有补贴电价情况下燃煤电厂选择第三方治理模式的最优计算结果
Table 6 Numerical results of optimal solutions to third-party control case with p3a* of coal power plant
t 1 2 3 4 5 6 7 8 9 10
β3* 1.194 0 1.194 0 1.194 0 1.194 0 1.194 0 1.194 0 1.054 4 1.054 4 1.054 4 1.054 4
p3E*/(元/(kW·h)) 0.030 6 0.030 6 0.030 6 0.030 6 0.030 6 0.030 6 0.015 8 0.015 8 0.015 8 0.015 8
p3a*/(元/(kW·h)) 0.006 3 0.006 3 0.006 3 0.006 3 0.006 3 0.006 3 0 0 0 0
NPVP3E*/万元 290 550 781 988 1 172 1 337 3 417 5 274 6 932 8 412
NPVE3E*/万元 -25 014 -18 776 -13 207 -8 234 -3 794 170 355 520 667 799
NPVSC3*/万元 -24 723 -18 226 -12 426 -7 246 -2 622 1 507 3 772 5 794 7 599 9 211