表5 仅有补贴电价情况下燃煤电厂选择自身投资运维模式的最优计算结果
Table 5 Numerical results of optimal solutions to self-investment case with p3Ia* of coal power plant
t 1 2 3 4 5 6 7 8 9 10
p3Ia*/(元/(kW·h)) 0.003 8 0.003 8 0.003 8 0.003 8 0.003 8 0.003 8 0.003 8 0.003 8 0.0038 0.0038
NPVP3I*/万元 -32 662 -28 968 -25 669 -22 724 -20 094 -17 747 -15 650 -13 779 -12 107 -10 615
t 11 12 13 14 15 16 17 18 19 20
p3Ia*/(元/(kW·h)) 0.003 8 0.003 8 0.003 8 0.003 8 0.003 8 0.003 8 0.003 8 0.003 8 0.003 8 0.003 8
NPVP3I*/万元 -9 283 -8 093 -7 031 -6 083 -5 236 -4 481 -3 806 -3 203 -2 665 -2 184
t 21 22 23 24 25 26 27 28 29 30
p3Ia*/(元/(kW·h)) 0.003 8 0.003 8 0.003 8 0.003 8 0.003 8 0.003 8 0.003 8 0 0 0