燃煤电厂环境污染第三方治理研究
|
黄华, 丁慧平
|
Environmental pollution control by a third party in coal-fired power plants
|
Hua HUANG, HuiPing DING
|
|
表5 仅有补贴电价情况下燃煤电厂选择自身投资运维模式的最优计算结果 |
Table 5 Numerical results of optimal solutions to self-investment case with of coal power plant |
|
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | /(元/(kW·h)) | 0.003 8 | 0.003 8 | 0.003 8 | 0.003 8 | 0.003 8 | 0.003 8 | 0.003 8 | 0.003 8 | 0.0038 | 0.0038 | /万元 | -32 662 | -28 968 | -25 669 | -22 724 | -20 094 | -17 747 | -15 650 | -13 779 | -12 107 | -10 615 | | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | /(元/(kW·h)) | 0.003 8 | 0.003 8 | 0.003 8 | 0.003 8 | 0.003 8 | 0.003 8 | 0.003 8 | 0.003 8 | 0.003 8 | 0.003 8 | /万元 | -9 283 | -8 093 | -7 031 | -6 083 | -5 236 | -4 481 | -3 806 | -3 203 | -2 665 | -2 184 | | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | /(元/(kW·h)) | 0.003 8 | 0.003 8 | 0.003 8 | 0.003 8 | 0.003 8 | 0.003 8 | 0.003 8 | 0 | 0 | 0 | /万元 | -1 755 | -1 372 | -1 031 | -725 | -453 | -209 | 8 | 123 | 226 | 318 |
|
|
|